11.11.2015

By results of 9 months of the year, power engineers of PJSC MOESK (Rosseti Group company) connected over 42.9 thousands of new facilities with their total power exceeding 1.37 GW.

The main scope of work was performed in the territory of the Moscow Region: 36.1 contracts for grid connection with power of 0.96 GW. In Moscow, connection was performed for 6.8 thousand applicants for total power of 0.41 GW. This is dynamics similar to the one observed last year both in terms of performed contracts and the connected power.

Since the beginning of the year, MOESK received over 75.9 thousand applications for grid connection of the facilities with the power exceeding 6.6 GW. Most applications (87 %) were received from the applicants that required minor power up to 15 kW. Since the beginning of the year, 8 % of all applications to the company were submitted from SMB segment, where, as rule, demanded power ranges from 15 up to 150 kW.

According to MOESK, growth of number of online applications has been observed throughout the year: about 30 % of all applicants preferred to submit the grid connection application online, via the Customer’s personal area in utp.moesk.ru. Another service gaining popularity is complete online connection that is now available to applicant categories requesting power up to 150 kW.

Let us remind you that today MOESK customer may choose any way to contact the company he / she prefers: by visiting any service center personally, calling to the single Light Line 8(800)700-40-70 or via the specialized grind connection portal.

“We try to maximize convenience of grid connection service and make it as user-friendly as possible. So that any person could grasp connection nuances, – says Aleksandr Pyatigor, Deputy Director General for Grid Connection and Service Development, PJSC MOESK. – The available proof of proper vector of our operations is recent results of World Bank Doing Business project, according to which Russia has improved its grid connection infrastructure as mush as for 24 items and was included in TOP 30 of the countries in terms of grid connection”.
true