30.06.2021

Rosseti Moscow Region power engineers have provided more than 400 kW of power to four socially significant facilities in the city district of Zaraysk.

The boiler houses are located in the villages of Zaraisky and the central building of the state farm "40 years of October", as well as in the village of Protekino and the village of Mendyukino. They provide hot water to more than 30 houses (both private houses and blocks of flats), with 1,650 people living there. Each of the boiler houses has the 2nd category of reliability, which implies the availability of a backup power source, along with the main one.

To provide the facilities with electricity, the engineers from the company's eastern branch have built several sections of 0.4 kV overhead lines with a total length of 640 meters, equipping them with self-supporting insulated wire, and also installed the necessary equipment complexes and electricity metering devices.

The volume of investments of Rosseti Moscow Region for the technological connection of socially significant facilities exceeds 2.2 million rubles.

— Each of the boiler houses is a newly built object, — said Andrey Sholokhov, Deputy Head of Urban Development in Zaraysk.
— Rosseti Moscow Region prepared all the necessary documents on time and also completed all construction works promptly and efficiently to connect the boiler houses to the power grids. Thanks to that, the administration of the Zaraysk city district will be able to implement a set of measures to prepare for the upcoming autumn-winter period in a prompt manner.

true