Light Line
8 800 220-0-220 Contact CenterProduction Asset Management System has Optimized MOESK’s Repair Program by 350 mn Rubles
We are open to cooperation and ready to offer information materials to journalists on the issues of the Company’s activity, help to arrange comments and interview with managers and leading specialists of PJSC “Rosseti Moscow Region”.
11.06.2014
Implementation of the production asset management system in JSC "MOESK" in 2014 helped to optimize the cost of the repair campaign in the amount of 350 million rubles. This was reported on the eve within the framework of the press conference "Intellectual Asset Management in the Russian energy sector" by Petr Sinyutin, director general of the energy company.
According to him, MOESK today faces an absolutely practical problem of optimization of current costs in conditions of rates growth containment. In the past year, within the 0.4-220 kV production assets management project, a unified computerized database of equipment was created, which included passport and operational characteristics for all electric grid facilities of JSC "MOESK" (about 3 million titles).
Today energy specialists of MOESK can control the actual technical condition of all electricity grid facilities and produce a group estimate for the dynamics of the status index change by the types and kinds of equipment. This, in turn, allows to adjust the plans and repair-related costs.
MOESK’s production program 2014 and the system of planning for subsequent periods were adjusted, taking into account the data of the equipment condition parameters.
According to Petr Sinyutin, the company should build a vertical system for the information exchange. Therefore, access to the database to date is provided at all levels of management in the company: from a EGD (electric grid district) foreman - to departments of the executive office.
The 2014-2015 includes plans for the integration of databases existing in MOESK, so the company will have a uniform analytical system.